Welcome to the NavList Message Boards.

NavList:

A Community Devoted to the Preservation and Practice of Celestial Navigation and Other Methods of Traditional Wayfinding

Compose Your Message

Message:αβγ
Message:abc
Add Images & Files
    Name or NavList Code:
    Email:
       
    Reply
    Miracle on the Hudson
    From: Bill B
    Date: 2017 Jul 27, 15:16 -0700

    In the film “Sully”  the  co-pilot Jeff Skiles was asked at the end of the hearing if there was anything he would do differently if he had to do it a again. He quipped he would do it in July. Which caused me to wonder if they would have cleared the George Washington bridge had the air been warmer  and barometric  pressure lower.

    From what I can ascertain the GW bridge is about 600 ft high and  they cleared it by about  900 feet (300 meters).  The general weather reported AM snow January 15, 2009 due to a fast moving low front. The best I can tell looking at isobars near the time of the water landing, and noting a reported  altimeter setting of 30.25 inches hg* (approx. 1024.4 mb) the pressure was on the high side and rising,  which should  have provided greater lift than 1013 mb would.

     

    My question to our experienced pilots is this: Had it been July with much warmer air and perhaps much lower barometric pressure, would the aircraft have cleared the bridge during its descent from 3000 feet? Put another way, how much affect would BP have on the airliner’s glide ratio?

     

    * http://www.weatherwise.org/Archives/Back%20Issues/2010/January-February%202010/retrospect-full.html

       
    Reply
    Browse Files

    Drop Files

    NavList

    What is NavList?

    Get a NavList ID Code

    Name:
    (please, no nicknames or handles)
    Email:
    Do you want to receive all group messages by email?
    Yes No

    A NavList ID Code guarantees your identity in NavList posts and allows faster posting of messages.

    Retrieve a NavList ID Code

    Enter the email address associated with your NavList messages. Your NavList code will be emailed to you immediately.
    Email:

    Email Settings

    NavList ID Code:

    Custom Index

    Subject:
    Author:
    Start date: (yyyymm dd)
    End date: (yyyymm dd)

    Visit this site
    Visit this site
    Visit this site
    Visit this site
    Visit this site
    Visit this site